top of page
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
IMPORTANT INSTALLATION NOTES
-
When gluing the socket fittings be sure not to use excessive amounts of glue or primer. Over-gluing the socket will push glue into the valve and weld the union/ball closed. Primer or glue on the internal ball of the valve will void warranty.
-
We recommend removing the valve from the socket end and gluing the socket and union lock ring to the pipe prior to installation of the valve.
-
Valves need a minimum runtime of 30 seconds in order to charge the return capacitor. Failure to do so will result in the valve not fulling closing.
-
Required amperage to open valve is 1.0 Amp at 24VAC/24VDC. Voltage will drop and stabilize at ~0.2 Amps after the ball has fully opened.
-
Please see our Warranty page for full warranty details.
bottom of page
